Injection Molding
Production-grade steel tooling in weeks
Rapid design molds to hardened steel production tools. Scientific molding, overmolding, and full PPAP support.
MANUFACTURING CAPABILITIES
From first prototype to full-scale production — CNC machining, injection molding, 3D printing, sheet metal, and more. Instant quotes, expert DFM, and parts as fast as 1 day.
Precision parts as fast as 1 day
3, 4, and 5-axis milling, turning, EDM, and gear hobbing with tolerances as tight as ±0.0001". 45+ metals and plastics available.
Production-grade steel tooling in weeks
Rapid design molds to hardened steel production tools. Scientific molding, overmolding, and full PPAP support.
Versatility and cost efficiency at any volume
Laser cutting, bending, forming, welding, and finishing. Prototype through production.
6 additive technologies, parts as fast as next-day
FDM, SLS, SLA, PolyJet, MJF, and Carbon DLS. From prototypes to end-use parts.
Complex metal parts at production volume
High-pressure and low-pressure die casting in aluminum, zinc, and magnesium.
Lower tooling costs with durable parts
Thermoset, rubber, and composite parts with lower tooling investment.
Production quality without tooling investment
Silicone molds from 3D-printed masters for production-quality parts at low volumes.
Silicone gaskets, rubber seals, and high-durometer components. Quote online with the same DFM feedback you expect from Fictiv.
Explore Compression MoldingMost engineers start with material and volume. Here's a quick comparison.
BEST FOR
Precision metal & plastic
MATERIALS
Metals, plastics
LEAD TIME
1–10 days
QTY RANGE
1–10,000
TOLERANCE
±0.0001"
BEST FOR
High-vol plastic parts
MATERIALS
Thermoplastics
LEAD TIME
2–6 weeks
QTY RANGE
500–1M+
TOLERANCE
±0.005"
BEST FOR
Enclosures, brackets
MATERIALS
AL, steel, SS
LEAD TIME
5–15 days
QTY RANGE
1–50,000
TOLERANCE
±0.005"
BEST FOR
Complex geometry
MATERIALS
Plastics, resins
LEAD TIME
1–5 days
QTY RANGE
1–500
TOLERANCE
±0.005"
BEST FOR
Complex metal at vol.
MATERIALS
AL, zinc, mag.
LEAD TIME
3–8 weeks
QTY RANGE
1K–500K+
TOLERANCE
±0.002"
BEST FOR
Low-vol, no tooling
MATERIALS
PU resins
LEAD TIME
10–15 days
QTY RANGE
1–200
TOLERANCE
±0.010"
BEST FOR
Rubber & composites
MATERIALS
Thermoset
LEAD TIME
3–6 weeks
QTY RANGE
100–50K
TOLERANCE
±0.010"
Explore 45+ metals, plastics, and finishes across all processes.
Upload your design, get instant pricing and DFM feedback.