CNC Part Complexity Quiz

Looking for a way to quickly and easily determine how complex your CNC machining part is? Look no further!

TAKE THE QUIZ

Latest tools

Tool

3D Printing Material Selector

Streamline your material selection process with our 3D Printing Material Selector.

Tool

Injection Molding Tolerances Calculator

Injection-molded plastic part tolerances are primarily driven by material shrinkage and nominal dimension, not the molding process alone. Different resins shrink at different rates as they cool, so the same nominal dimension can require a tighter or looser tolerance depending on the material you choose. Tolerance standards give you a consistent way to account for […]

Tool

Cantilever Beam Deflection Calculator

Designing components for load-bearing applications often requires balancing stiffness, weight, and manufacturability. One of the most effective ways to increase stiffness without adding material is by adjusting the geometry of the cross-section, which directly affects the part’s area moment of inertia (MOI). In beam bending problems, the area moment of inertia describes how a cross-section […]

Tool

Supply Chain Risk & Resilience Calculator

See how supplier mix, inventory buffers (safety stock), and operational choices impact supply chain resilience and risk—so you can prioritize actions that strengthen your supply chain. Who this supply chain calculator is for What you’ll get to support your supply chain management How the supply chain calculator works Enter whole-number inputs for the factors you […]

Tool

Digital Manufacturing
Value Calculator

Check out our Calculator to see what the results look like for you

Tool

Free Template: Injection Molding Gantt Chart

Injection molding is a complex process. You have to not only design your mold and tooling, but also manage all the moving pieces, hit your deadline, and ensure the parts are manufactured to spec within budget. It’s a lot, right? Leveraging years of injection molding production experience, we created this Gantt chart template to help […]

Tool

Coding for Mechanical Engineers: Supplementary Tools

Download this PDF to get access to VBA commands and Solidworks Macros and scripts to improve your mechanical engineering workflow efficiency.

Tool

10 DFA Rules to Live By Checklist

How can you make your designs easier for your friends on the manufacturing floor and, well, more elegant? This handy checklist summarizes 10 essential design for assembly (DFA) rules that will help you simplify designs as much as possible, to save your company in a big way, both in manufacturing time and in reducing defects.

Tool

Design Failure Modes and Effects Analysis (D-FMEA) Template

In the product design world, it’s common to use a tool called a Failure Modes and Effects Analysis (FMEA) to improve a design or process. FMEAs are commonly separated into two different categories, depending on their application: A Design FMEA (D-FMEA) is used in product design to identify possible design weaknesses and failure modes. A […]

Tool

DFM for CNC Machining Checklist

Get our DFM for CNC machining checklist, which summarizes the essential design for manfuacturability rules engineers should apply.