7x
Faster lead time on Honeywell's aerospace-grade APU component
Certified Manufacturing Network
Skip the 6-month supplier audit. Most suppliers can make your part. Very few can prove it was made to spec. Fictiv's certified network includes AS9100D, ISO 13485, and Nadcap-approved manufacturing partners — with traceability available on every order.
7x
Faster lead time on Honeywell's aerospace-grade APU component
±0.0001"
Tightest achievable tolerance in Fictiv's CNC network
4
Certification standards: AS9100D, ISO 13485, ISO 9001, Nadcap
Supplier qualification shouldn't be a recurring drain on your quality team's bandwidth.
AS9100D, ISO 13485, Nadcap — Fictiv's network includes pre-qualified and pre-audited manufacturing partners. When you need a certified supplier, Fictiv’s sourcing and quality systems match your order with appropriately certified manufacturing partners. No 3–6 month qualification cycle.
Talk to a Sourcing Expert >Every order offers raw material certifications, heat/lot traceability, and quality documentation for regulated manufacturing programs. CoC, dimensional inspection reports, and CMM data are available on demand in the platform — not chased down after delivery.
Discuss Tariff Strategy >Complex geometries require rigorous verification. Fictiv provides advanced GD&T and CMM inspection reports to guarantee your most critical features meet exact specifications.
See the Platform in Action >| . | Qualifying a New Certified Supplier |
|---|---|
| Qualification timeline | 3–6 months |
| AS9100D / ISO 13485 verification | Must audit independently |
| Material traceability | Manual, often incomplete |
| CoC / inspection reports | Must request separately |
| Advanced GD&T & CMM | Variable capabilities per shop |
| Exception management | Discovered at delivery |
| Zero — pre-qualified on platform |
| Certifications on file |
| Full chain of custody, digital records |
| On demand through the platform |
| Standardized, rigorous inspection options |
| Real-time alerts before parts ship |
7x
faster.
Aerospace
quality documentation.
Zero
qualification overhead.
“Our customers have this mindset of expecting our products much more rapidly, and as a business, we want to meet those needs in the market.”
Jon Hobgood
VP Advanced Manufacturing & Automation, Honeywell
Document
When Available
Can Fictiv provide inspection reports, material certifications, and certificates of conformity (CoCs)?
Can Fictiv handle complex parts with tight tolerances and detailed 2D drawings?
How does Fictiv protect sensitive CAD files and manufacturing IP?
How reliable is delivery when using a distributed manufacturing network?
Is Fictiv built to support enterprise procurement and compliance requirements?
Can Fictiv support regulated or mission-critical manufacturing programs?